Case Studies

Structural solutions. Dependable performance.

Guangzhou Tunnel, China

A trenchless rehabilitation project on 200 feet of an arch tunnel, in old town Guangzhou in Guangdong Province of the People’s Republic of China, an ideal opportunity to demonstrate Sprayroq products for the city’s utility departments.

Read Full Case Study

Palm Beach Manhole Rehabilitation

Master Lift Station 13A in Manatee County, FL was in need of rehabilitation due to heavy deterioration of its walls and high levels of dA sanitary manhole at the intersection of North Lake Way and Mockingbird Trail in the Town of Palm Beach, Fla., was a heavily deteriorated brick structure exhibiting the presence of groundwater infiltration.

Read Full Case Study

Manatee County Lift Station

Master Lift Station 13A in Manatee County, FL was in need of rehabilitation due to heavy deterioration of its walls and high levels of debris that was causing the overuse of pumps.

Read Full Case Study

Manistee 52-In. Storm Sewer

The 52-inch storm sewer was installed in the early 1900s. The line takes in all of the storm water for the south side of the city. The sewer is 20 feet deep and runs along railroad tracks, then discharges into the Manistee River.

Read Full Case Study

MWRD Chicago Interceptor

The existing sewer to be rehabilitated was approximately 80 years old and was located 20 ft. below ground in Evanston, Illinois, a northern suburb of Chicago. The sewer started at a river edge overflow chamber in a school parking lot.

Read Full Case Study

Apply to be a Sprayroq™ Certified Partner

Apply to become a Sprayroq™ Certified Partner (SCP) and you too can experience the profitability that comes with protected territories and a powerful, resilient product that you can trust.