SCPs on a jobsite

BECOME A SPRAYROQ CERTIFIED PARTNER

Secure a strong future with a powerful, resilient product.

  • This field is for validation purposes and should be left unchanged.

OPEN TERRITORIES

Arkansas, Illinois, Iowa, Kansas, Louisiana,  Michigan, Minnesota, Missouri, Nebraska, New Mexico, New York, North Dakota, Oklahoma, South Dakota, Utah, Washington, Wisconsin

Protected Territories

As a Sprayroq Certified Partner, you gain access to exclusive application territories. This strategic advantage allows you to capitalize on market opportunities with confidence, fostering business growth and stability. By securing a designated territory, you can build and expand your customer base without the constant threat of local competitors, enabling you to focus on delivering the highest quality service and leveraging Sprayroq’s innovative solutions to meet your clients’ unique needs.

Gradient of Tools

Advanced Training Programs
2 weeks of rigorous training

Learn about Sprayroq™ ’s materials, equipment, application techniques, cleanup and maintenance procedures, marketing and promotion, and customer service.

  • 1 week at our state-of-the-art facility
  • 1 week in your home territory

*All new contractors must receive certification to SCP status from Sprayroq, prior to offering services. All SCPs must submit to an annual skills review to maintain their certification.

Ohio DOT Twin Culverts

On Route 23 in Alvada, Ohio, two side-by-side 13’-6”W x 8’-6”H x 90’L corrugated steel sheet plate culverts running underneath the roadway needed corrosion protection.

Read Full Case Study

Guangzhou Tunnel, China

A trenchless rehabilitation project on 200 feet of an arch tunnel, in old town Guangzhou in Guangdong Province of the People’s Republic of China, an ideal opportunity to demonstrate Sprayroq products for the city’s utility departments.

Read Full Case Study

Palm Beach Manhole Rehabilitation

Master Lift Station 13A in Manatee County, FL was in need of rehabilitation due to heavy deterioration of its walls and high levels of dA sanitary manhole at the intersection of North Lake Way and Mockingbird Trail in the Town of Palm Beach, Fla., was a heavily deteriorated brick structure exhibiting the presence of groundwater infiltration.

Read Full Case Study

Manatee County Lift Station

Master Lift Station 13A in Manatee County, FL was in need of rehabilitation due to heavy deterioration of its walls and high levels of debris that was causing the overuse of pumps.

Read Full Case Study

Manistee 52-In. Storm Sewer

The 52-inch storm sewer was installed in the early 1900s. The line takes in all of the storm water for the south side of the city. The sewer is 20 feet deep and runs along railroad tracks, then discharges into the Manistee River.

Read Full Case Study

Apply to be a Sprayroq™ Certified Partner

Apply to become a Sprayroq™ Certified Partner (SCP) and you too can experience the profitability that comes with protected territories and a powerful, resilient product that you can trust.